Here to Help
Talk to our experts today customer.care@tecquipment .com
Quality Guaranteed
All equipment is precision engineered and tested by specialist technicians
Documentation
All equipment comes with extensive user guides with installation, safety and outline experiments
5 Year Warranty
We provide only the finest equipment and guarantee them with a 5-year warranty
Training & Installation
Extensive installation, commissioning and training is available from our engineers at your premises
First-Class Delivery
Packed and shipped on-site so rest assured your equipment will arrive quickly and safely
PSA40 - Auxiliar

POWER FACTOR LOAD BANK

PDF datasheet
A mobile load bank to provide balanced and unbalanced three-phase loads and single-phase loads with variable leading or lagging power factors.

OR CALL US TO DISCUSS+44 1159 722 611

POWER FACTOR LOAD BANK
The Power Factor Load Bank is a free-standing and mobile unit. It gives predictable load and power factor characteristics, useful for many different power systems experiments. It also helps to show the principles of a static VAr compensator used in industrial plants and large factories.
The load bank provides three separate inputs: Lines 1, 2 and 3. This allows it to work with single and three-phase circuits. Each line is independent, which allows it to connect with the others as a star or delta load.
The load bank includes three separate banks of resistive, inductive and capacitive loads. They give a choice and combination of types of loads to give unity (resistive only) and leading or lagging power factor. A voltage-selector switch allows the load bank to work with different line voltages for single and three-phase circuits. Each bank (line) may be set to different values, to give an unbalanced load for balanced and unbalanced load tests.
The top of the load bank includes a useful worktop for any additional instruments or for recording results. The load bank has small wheels, for easy mobility. This saves time setting up experiments and clearing the classroom or laboratory after use.

When used with other suitable equipment for the Power Systems Laboratory range it can show:

  • Balanced loading
  • Unbalanced loading
  • Varying load with fixed lagging or leading power factor
  • Neutral displacement
  • Relationship between Watts, VArs and VA
  • Power factor correction
  • Methods of determining power factor
  • Static VAr compensators

NEED MORE INFORMATION?

We're here to answer your questions